Table 3 lists the basic specifications of this machine. The machine was delivered to the project site in July 1998 and reassembled and fieldtested. Independent contractors were used to drive the 5,650m long, diameter tunnel, starting from Adit #1. The excavation was completed at the other end of the reef on July 29, 2000.